Vireo Glass custom showers for Alabama: the process
Remote consult, field measure, fabrication, and a single-visit install for Alabama projects.

For Alabama clients the process mirrors Florida but with tighter planning: logistics sit between measure, fabrication, and install, and glass does not tolerate rushing the last step.
It starts with a remote consultation. You send photos of the wet area, approximate opening dimensions, and a description of what you want. From that we rule out unworkable options, propose one or two configurations, and schedule the measure visit.
The measure happens on finished tile — that rule does not change by state. Our tech records actual dimensions, angles, plumb, and slope, photographs obstacles, and produces a drawing. You then approve sizes, glass thickness, and the hardware package.

Fabrication begins only after drawing approval. Schedule discipline matters here: holes are drilled before tempering, so any dimension change means a brand new panel. That is why we lock hardware and thickness earlier than we would on a job around the corner.
Installation is planned as a single visit with time to spare. Setting the enclosure takes two to five hours, followed by a water test and a care walkthrough. No showering for the first 24 hours while sealant cures.
A common Alabama case is framed walls with no blocking for frameless hinges. If your remodel is still open, we will tell you where to add blocking while the wall is accessible. Send photos through contacts, see the full workflow under measure and install, and get a budget range from the quiz.



